Originally erected in 1979, this building underwent a two-stage extension and transformation process that began in 1992 and ended in 2006. With these two new wings, the complex is arranged into three areas: the studio and workshop stage, the great hall, and the lakeside grandstand. The spacious urban square directly in front also adds a dash of international flair, not least during the festival season.
Design: Dietrich | Untertrifaller, 1997-2006
ÖffnungszeitenAttractive tour around the building. Starting at the square you pass the building to the right, continue to the floating stage, passing the workshop stage and the administrative tract around the building (out of the festival season)
Guided Tours -A look behind the scenes
Autor: vai Vorarlberger Architektur Institut
letzte Änderung: 13.07.2021Anfahrt:
Anfahrtsplaner